Melissa Gordon
Euclid Tunnel Drawing
2011
The wall within the pedestrian tunnel will be approximately 100 feet in length. The roots will be made out of concrete, which will be done by creating a series of formliners/moulds. The formliners will be milled on a CNC machine and then given to the contractors who pour the concrete walls. The layers will most likely consist of alternating sandstone, river rock, and recycled glass tiles.
PREV / NEXT   11 / 12
BACK TO EUCLID/16TH STREE...